Pumping system optimises district heating operation

Pumping system optimises district heating operation

At Silkeborg's combined heat and power plant, multiple energy forms are combined to produce electricity and district heating for approximately 20,000 district heating customers. The plant receives energy from, among other sources, the world's largest liquid-based solar heating system, natural gas and surplus power from wind turbines. The optimal combination of different energy forms is controlled and distributed by a pumping system with instrumentation from Gustaf Fagerberg A/S.

On a summer's day, when the sun shines, the whole of Silkeborg's district heating consumption is covered by solar heat from the world's largest solar heating facility, and when the wind blows and the wind turbines produce more electricity than is needed, it goes directly into the production of district heating or is stored for later use as hot water in large tanks at Silkeborg's combined heat and power plant. If it is calm and the sun is not shining, the combined heat and power plant produces both electricity for the electricity grid and district heating for Silkeborg's consumers using natural gas. For the most part, it is a combination of these energy sources that are used in the most optimal way – both with regard to supply security and economy. The practical combination of the various energy sources is done by means of a pumping station recently erected by Valmont SM A/S, which automatically ensures that the various energy sources are utilised as efficiently as possible.

DENMARK'S LARGEST DECENTRALISED NATURAL GAS PLANT Sales Engineer Tomislav Antic, Gustaf Fagerberg A/S, at one of the many Krohne flow meters at the pumping station.

DENMARK'S LARGEST DECENTRALISED NATURAL GAS PLANT

"Silkeborg combined heat and power plant is Denmark's largest decentralised, natural gas-fired combined heat and power station, producing electricity and supplying district heating to approximately 20,000 consumer points in Silkeborg," explains chief engineer Per Hvilshøj Christiansen, Silkeborg Forsyning A/S. "Electricity from the combined heat and power plant is produced by a steam turbine and two derivative gas turbines with a combined capacity of 108 megawatts. District heating water is heated by waste heat from steam production or by means of an electric boiler and a natural gas boiler. "The electric boiler alone has a capacity of 30 megawatts, and in this boiler we utilise electricity from wind turbines during periods when the wind turbines produce more electricity than the grid requires – and when electricity is therefore cheap," continues Per Hvilshøj Christiansen. "The plant's two gas turbines have Dry Low-NOx combustion chambers, which ensure a low level of nitrogen oxide in the approximately 500-degree hot flue gas from the gas turbines, which is cooled to approximately 68 degrees in the two exhaust boilers. A subsequent flue gas condensation system further reduces the exhaust temperature and thereby increases the plant's overall efficiency to nearly 100 per cent. The exhaust gas has a heat output of 82 megajoules per second. The product of this process is steam, which delivers some of its energy to electricity production in the steam turbine. With its generator, this increases the plant's electrical efficiency by 10 per cent. The used steam from the steam turbine is cooled in a district heating condenser, which produces 85-degree hot water for the district heating network. The turbines' generators produce 10,000 volt alternating current, which is stepped up to 60,000 volts in machine transformers before the electricity is supplied to the grid. "In 2016 we established the world's largest liquid-based solar collector system to date at Sejling Hede near the combined heat and power plant. It consists of 12,436 solar collectors with a combined area of 156,694 square metres, and with a peak output of 110 megawatts can annually produce approximately 80,000 megawatt-hours, which covers approximately 20 per cent of our heating requirements.

Water from the solar heating system is between 40 and 80 degrees depending on the season and is conveyed from the solar heating system to the pumping station through a 600-millimetre pipeline. Through the pumping station the water is either directed onto the flow line to the district heating water, to one of the boilers or to one of our four accumulator tanks, each holding 16,000 cubic metres," explains Per Hvilshøj Christiansen.

SYSTEM DISTRIBUTES THE ENERGY Project Manager Kenneth Toft Hansen, Valmont SM A/S (left), and Tomislav Antic, at some of the pumping station's many pressure transmitters.

SYSTEM DISTRIBUTES THE ENERGY

The pumping system, which is controlled by a temperature optimisation system within the overarching ABB Scada system, is supplied by Valmont SM. It comprises pipes, pumps, valves and instrumentation that ensure the distribution of water between the power/heat plant's various energy forms. Valmont SM has managed the entire pumping system as a turnkey project, which has included metalwork in connection with the delivery and installation of pipes, pumps, valves and other equipment. All pipes, in sizes up to DN 900, are thus prefabricated from a 3D model, and assembly and insulation work are carried out according to a sequence and schedule manual. The entire project for establishing the pumping system took approximately one year. The instrumentation for the pumping system, which comprises pressure transmitters, flow meters and temperature transmitters from Krohne Messtechnik GmbH, is supplied by Fagerberg. On the entire pumping system, 31 pressure transmitters of the type OPTIBAR PC5060 C, 6 differential pressure transmitters of the type OPTIBAR DP 7060 C, 8 special ultrasonic flow meters for district heating type OPTISONIC 3400 DN80–DN400, 1 ultrasonic clamp-on flow meter of the type OPTISONIC 6300 and 38 temperature transmitters of the type OPTITEMP TRA/TCA are installed. "The pressure transmitters are selected with a ceramic diaphragm which makes them extremely robust against physical impact, such as pressure spikes and rapidly changing temperatures. The flow meters are from Krohne's range of ultrasonic flow meters, which are particularly suited to district heating water, since they can handle high temperatures and have no requirement for conductivity in the medium, and the temperature transmitters are manufactured at Krohne's factory in Sweden, in accordance with the special requirements and specifications of the tender material," explains Fagerberg Sales Engineer Tomislav Antic.

Marine Engineer Per Hvilshøj Christiansen, Silkeborg Forsyning A/S, in the control room of Silkeborg power and district heating plant. Normally unmanned, staff can monitor and control it via screens.